Reference Manual
×
Menu

Pre-Arrival Injection Optimization

 
Gas can be injected after the sales valve is opened, but before the plunger arrives using the Pre-Arrival Injection settings. The injection set point can be automatically adjusted by the program via the Pre-Arrival Injection Optimization settings.
 
Details of the optimization algorithm are shown in the flow chart below.
 
Pre-Arrival Injection Optimization Flow Chart